logo

Lovo Interchange as part of the Stockholm Bypass Project

Sector: Cement • Location: Stockholm, Sweden

Source: Highways Today

Project
Ongoing

Züblin Scandinavia AB, a Swedish subsidiary of publicly listed STRABAG SE, has been awarded the contract by the Swedish Transport Administration (Trafikverket) to build FSE309 Lovö Interchange, a part of the Stockholm Bypass road project. The interchange is situated in a nature reserve with a sensitive historico-cultural background. The project comprises the construction of a new four-lane road wi

Project Information FAQ

Project Information

5 Q
The project “Lovo Interchange as part of the Stockholm Bypass Project” is an infrastructure initiative in the Cement sector, located in Stockholm, Sweden. Taiyo aggregates data on it from Highways Today.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Züblin Scandinavia AB, a Swedish subsidiary of publicly listed STRABAG SE, has been awarded the contract by the Swedish Transport Administration (Trafikverket) to build FSE309 Lovö Interchange, a part of the Stockholm Bypass road project. The interchange is situated in a nature reserve with a sensitive historico-cultural background. The project comprises the construction of a new four-lane road with interchanges, pedestrian and cycle paths, rock tunnels, a service tunnel, concrete troughs, etc. The Lovö Interchange serves as a connection between the Stockholm Bypass tunnel ramps and the surface road network on Ekerö/Lovö islands via the existing Ekerövägen (Road 261). An important prerequisite for the construction process is that car, pedestrian and bicycle traffic proceed without disturbance throughout the construction period.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data