logo
ProjectEnded

Low price wave energy conversion through force cancellation.

The status, timeline and source of this project. A free account opens every field.

Source: EU Funding & Tenders Portal

No attempt to harvest energy from waves has resulted in an economically viable and competitive technology. Many projects stopped and investors have become sceptical of wave power. Currently the cost per watt of usable wave energy is high, due to a focus on energy conversion methods and efficiency, rather than on mooring and grid connection, accounting for more than 90% expenditure. Wavepiston is a

Status
Closed
Sector
Water Supply and Storage, Warehouse, Power Generation (CCGT)
Location
Denmark, Italy, Netherlands, Finland
Updated
22 Jul 2026
Source
EU Funding & Tenders Portal

ConstructChat

Ask ConstructChat about Low price wave energy conversion through force cancellation.

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Low price wave energy conversion through force cancellation.” is an infrastructure initiative in the Water Supply and Storage sector, located in Denmark, Italy, Netherlands, Finland. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Participants

Not available for this record.

Status

Original status

ended

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

No attempt to harvest energy from waves has resulted in an economically viable and competitive technology. Many projects stopped and investors have become sceptical of wave power. Currently the cost per watt of usable wave energy is high, due to a focus on energy conversion methods and efficiency, rather than on mooring and grid connection, accounting for more than 90% expenditure. Wavepiston is a break through near-shore wave power technology producing energy from waves at a competitive price with respect to the most efficient renewable energy technologies. The system consists of identical modules mounted on a string pumping pressurized water to shore for successive energy conversion. Using Wavepiston’s patented “force cancellation” principle the system is able to reduce the amount of forces on the mooring and structure to 1:10, requiring a simpler structure and therefore reducing capital costs. The Wavepiston system can provide cost efficient, clean and reliable renewable energy to help meet Europe’s increasing demand and achieve emissions reduction targets. The offshore application ensures it is a suitable fit also for remote islands and isolated coastal communities. The Wavepiston system was conceived in 2006 and in 2009 the concept of force cancellation was patented. In 2010 numerous tank tests were performed with a system 1:30 the size, that experimentally validated the system and proved each panel can harvest more than 5% of the energy contained in a wave. In 2013 a proof of concept was carried out offshore with a system 1:9 the size and it worked better than predicted. Vryhof Anchors and Nurmi Cylinders, specialised in offshore mooring and hydraulic pumps respectively, have joined the project to support product industrialization. Phase 1 will assess various business models (with the support of the ESCO company EnerMed partner in the project), establish a complete supply chain and plan all activities for the large scale pilot to be held in Ireland.

Location

Country

Denmark, Italy, Netherlands, Finland

Source

Source

EU Funding & Tenders Portal

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Warehouse, Power Generation (CCGT)

Article published date

2026-01-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project