Lowell Street/Telegraph Road Restoration Project
The status, timeline and source of this project. A free account opens every field.
Source: Cleveland
A half-mile stretch of Lowell Street/Telegraph Road in Elyria's West End is undergoing restoration work. The project involves reducing the road to a single lane between Murray Ridge Road and State Route 113, with temporary traffic signals in place. The restoration work began in February and is expected to be completed by April 28, 2026, weather permitting.
- Status
- Under Construction
- Sector
- Road
- Location
- Elyria, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Cleveland
ConstructChat
Ask ConstructChat about Lowell Street/Telegraph Road Restoration Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A half-mile stretch of Lowell Street/Telegraph Road in Elyria's West End is undergoing restoration work. The project involves reducing the road to a single lane between Murray Ridge Road and State Route 113, with temporary traffic signals in place. The restoration work began in February and is expected to be completed by April 28, 2026, weather permitting. |
Original sector | Transport |
Location
Country | United States of America (USA) |
State | Ohio |
City | Elyria |
Source
Source | Cleveland |
URL |
More Details
Record type | Project |
Sector | Road |
Article published date | 2026-04-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
