Lower Arun Hydro-Electric Project Package-2
Sector: Power Generation (CCGT) • Location: Tumlingtar, Nepal
Source: Business Standard
The Package-2 encompasses the execution of critical civil and hydro-mechanical works integral to the Lower Arun Hydro-Electric Project. This includes construction of Adit-5 and Adit-6 leading to the Head Race Tunnel, the Part Head Race Tunnel (10.5 meters diameter, 5.41 km length), Surge Shaft and gates, Pressure Shaft with Butterfly Valve Chamber and Access Adit, Power House, Switchyard, Surface
- Status
- Closed
- Sector
- Power Generation (CCGT), Hydro, Water Supply and Storage, Tunnel, Road, Steel
- Location
- Tumlingtar, Nepal
- Updated
- 22 Jul 2026
- Source
- Business Standard
ConstructChat
Ask ConstructChat about Lower Arun Hydro-Electric Project Package-2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Package-2 encompasses the execution of critical civil and hydro-mechanical works integral to the Lower Arun Hydro-Electric Project. This includes construction of Adit-5 and Adit-6 leading to the Head Race Tunnel, the Part Head Race Tunnel (10.5 meters diameter, 5.41 km length), Surge Shaft and gates, Pressure Shaft with Butterfly Valve Chamber and Access Adit, Power House, Switchyard, Surface Pothead Yard, Tail Race Channel, installation of steel liners for Pressure Shafts, Draft Tube Gates and hoists, and completion of associated road works and supporting infrastructure. These components ensure efficient water conveyance, energy generation, and long-term operational reliability. |
Original sector | Energy |
Budget |
Location
Country | Nepal |
City | Tumlingtar |
Source
Source | Business Standard |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Hydro, Water Supply and Storage, Tunnel, Road, Steel |
Article published date | 2026-04-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
