logo

Lower Arun Hydro-Electric Project Package-2

Sector: Power Generation (CCGT) • Location: Tumlingtar, Nepal

Source: Business Standard

Project
Awarded

The Package-2 encompasses the execution of critical civil and hydro-mechanical works integral to the Lower Arun Hydro-Electric Project. This includes construction of Adit-5 and Adit-6 leading to the Head Race Tunnel, the Part Head Race Tunnel (10.5 meters diameter, 5.41 km length), Surge Shaft and gates, Pressure Shaft with Butterfly Valve Chamber and Access Adit, Power House, Switchyard, Surface

Status
Closed
Sector
Power Generation (CCGT), Hydro, Water Supply and Storage, Tunnel, Road, Steel
Location
Tumlingtar, Nepal
Updated
22 Jul 2026
Source
Business Standard

ConstructChat

Ask ConstructChat about Lower Arun Hydro-Electric Project Package-2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Lower Arun Hydro-Electric Project Package-2” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Tumlingtar, Nepal. Taiyo aggregates data on it from Business Standard.

Participants

Not available for this record.

Status

Original status

awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Package-2 encompasses the execution of critical civil and hydro-mechanical works integral to the Lower Arun Hydro-Electric Project. This includes construction of Adit-5 and Adit-6 leading to the Head Race Tunnel, the Part Head Race Tunnel (10.5 meters diameter, 5.41 km length), Surge Shaft and gates, Pressure Shaft with Butterfly Valve Chamber and Access Adit, Power House, Switchyard, Surface Pothead Yard, Tail Race Channel, installation of steel liners for Pressure Shafts, Draft Tube Gates and hoists, and completion of associated road works and supporting infrastructure. These components ensure efficient water conveyance, energy generation, and long-term operational reliability.

Original sector

Energy

Budget

Location

Country

Nepal

City

Tumlingtar

Source

Source

Business Standard

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Hydro, Water Supply and Storage, Tunnel, Road, Steel

Article published date

2026-04-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project