Lower Arun Hydroelectric Project Package 2
Sector: Power Generation (CCGT) • Location: Nepal
Source: The Economic Times
Patel Engineering has been awarded the contract for the Lower Arun Hydroelectric Project (669 MW), Package 2, in Nepal. The project is valued at Rs 1,593.08 crore and is scheduled to be completed within 54 months. The project aims to harness Nepal's hydroelectric potential for sustainable growth and energy independence.
- Status
- Closed
- Sector
- Power Generation (CCGT)
- Location
- Nepal
- Updated
- 22 Jul 2026
- Source
- The Economic Times
ConstructChat
Ask ConstructChat about Lower Arun Hydroelectric Project Package 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Patel Engineering has been awarded the contract for the Lower Arun Hydroelectric Project (669 MW), Package 2, in Nepal. The project is valued at Rs 1,593.08 crore and is scheduled to be completed within 54 months. The project aims to harness Nepal's hydroelectric potential for sustainable growth and energy independence. |
Original sector | Energy |
Budget |
Location
Country | Nepal |
Source
Source | The Economic Times |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2026-04-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
