logo

Lower Arun Hydroelectric Project Package 2

Sector: Power Generation (CCGT) • Location: Nepal

Source: The Economic Times

Project
Awarded

Patel Engineering has been awarded the contract for the Lower Arun Hydroelectric Project (669 MW), Package 2, in Nepal. The project is valued at Rs 1,593.08 crore and is scheduled to be completed within 54 months. The project aims to harness Nepal's hydroelectric potential for sustainable growth and energy independence.

Status
Closed
Sector
Power Generation (CCGT)
Location
Nepal
Updated
22 Jul 2026
Source
The Economic Times

ConstructChat

Ask ConstructChat about Lower Arun Hydroelectric Project Package 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Lower Arun Hydroelectric Project Package 2” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Nepal. Taiyo aggregates data on it from The Economic Times.

Participants

Not available for this record.

Status

Original status

awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Patel Engineering has been awarded the contract for the Lower Arun Hydroelectric Project (669 MW), Package 2, in Nepal. The project is valued at Rs 1,593.08 crore and is scheduled to be completed within 54 months. The project aims to harness Nepal's hydroelectric potential for sustainable growth and energy independence.

Original sector

Energy

Budget

Location

Country

Nepal

Source

Source

The Economic Times

URL

More Details

Record type

Project

Sector

Power Generation (CCGT)

Article published date

2026-04-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project