Lower Arun Hydropower Project Package 2
Sector: Manufacturing (Industrial) • Location: Nepal
Source: ET Manufacturing
The project involves civil and hydro-mechanical works for the 669 MW Lower Arun Hydropower Project in Nepal's Sankhuwasabha district. It includes construction of head race tunnels, surge shafts, pressure shafts, powerhouse, switchyard, tail race channel, installation of steel liners, draft tube gates, related equipment, and development of access roads and supporting infrastructure. The project is
- Status
- Closed
- Sector
- Manufacturing (Industrial), Power Generation (CCGT), Steel, Hydro, Road
- Location
- Nepal
- Updated
- 22 Jul 2026
- Source
- ET Manufacturing
ConstructChat
Ask ConstructChat about Lower Arun Hydropower Project Package 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves civil and hydro-mechanical works for the 669 MW Lower Arun Hydropower Project in Nepal's Sankhuwasabha district. It includes construction of head race tunnels, surge shafts, pressure shafts, powerhouse, switchyard, tail race channel, installation of steel liners, draft tube gates, related equipment, and development of access roads and supporting infrastructure. The project is expected to be completed within 54 months. |
Original sector | Energy |
Budget |
Location
Country | Nepal |
Source
Source | ET Manufacturing |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Power Generation (CCGT), Steel, Hydro, Road |
Article published date | 2026-04-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
