Lower Arun Hydropower Project Package 2
Sector: Power Generation (CCGT) • Location: Nepal
Source: Business Standard
The project involves critical civil and hydro-mechanical works including construction of tunnels, surge shafts, pressure shafts, powerhouse infrastructure, and associated systems. It covers key components such as head race tunnels, access adits, pressure shafts, butterfly valve chambers, installation of steel liners and other supporting infrastructure for efficient water conveyance and power gener
- Status
- Closed
- Sector
- Power Generation (CCGT), Hydro, Water Supply and Storage, Steel
- Location
- Nepal
- Updated
- 22 Jul 2026
- Source
- Business Standard
ConstructChat
Ask ConstructChat about Lower Arun Hydropower Project Package 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves critical civil and hydro-mechanical works including construction of tunnels, surge shafts, pressure shafts, powerhouse infrastructure, and associated systems. It covers key components such as head race tunnels, access adits, pressure shafts, butterfly valve chambers, installation of steel liners and other supporting infrastructure for efficient water conveyance and power generation. |
Original sector | Energy |
Budget |
Location
Country | Nepal |
Source
Source | Business Standard |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Hydro, Water Supply and Storage, Steel |
Article published date | 2026-04-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
