logo

Lower Arun Hydropower Project Package 2

Sector: Power Generation (CCGT) • Location: Nepal

Source: ET Infra

Project
Awarded

The project involves civil and hydro-mechanical works for the 669 MW Lower Arun Hydropower Project in Nepal, including construction of head race tunnels, surge shafts, pressure shafts, powerhouse, switchyard, tail race channel, installation of steel liners, draft tube gates, and development of access roads and supporting infrastructure.

Status
Closed
Sector
Power Generation (CCGT), Steel, Hydro, Road
Location
Nepal
Updated
22 Jul 2026
Source
ET Infra

ConstructChat

Ask ConstructChat about Lower Arun Hydropower Project Package 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Lower Arun Hydropower Project Package 2” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Nepal. Taiyo aggregates data on it from ET Infra.

Participants

Not available for this record.

Status

Original status

awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves civil and hydro-mechanical works for the 669 MW Lower Arun Hydropower Project in Nepal, including construction of head race tunnels, surge shafts, pressure shafts, powerhouse, switchyard, tail race channel, installation of steel liners, draft tube gates, and development of access roads and supporting infrastructure.

Original sector

Energy

Budget

Location

Country

Nepal

Source

Source

ET Infra

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Steel, Hydro, Road

Article published date

2026-04-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project