Lower Arun Hydropower Project
Sector: Hydro • Location: Nepal
Source: Power Peak Digest
Patel Engineering Limited has been declared L1 for a Rs 1,593.08 crore contract for the 669 MW Lower Arun Hydropower Project in Nepal. The contract covers civil and hydro-mechanical works including tunnels, shafts, powerhouse, and associated infrastructure. The project is located near Tumlingtar and is scheduled for completion within 54 months.
- Status
- Closed
- Sector
- Hydro, Power Generation (CCGT)
- Location
- Nepal
- Updated
- 22 Jul 2026
- Source
- Power Peak Digest
ConstructChat
Ask ConstructChat about Lower Arun Hydropower Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Patel Engineering Limited has been declared L1 for a Rs 1,593.08 crore contract for the 669 MW Lower Arun Hydropower Project in Nepal. The contract covers civil and hydro-mechanical works including tunnels, shafts, powerhouse, and associated infrastructure. The project is located near Tumlingtar and is scheduled for completion within 54 months. |
Original sector | Energy |
Budget |
Location
Country | Nepal |
Source
Source | Power Peak Digest |
URL |
More Details
Record type | Project |
Sector | Hydro, Power Generation (CCGT) |
Article published date | 2026-04-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
