Lower Berkeley Influent Flowmeter
Closed · South Carolina · Last reported Jul 2024
Source: Dodge USA
SUMMARY: Berkeley County is requesting proposals to provide and install a 36-inch magnetic flowmeter manufactured by Toshiba. The work consists of furnishing all material, labor and equipment. 2. FLOW METER INSTALL a. Meter Installation i. Divert flow to bypass piping. ii. Cut out flange x flange pipe @ FM Area. iii. Remove pipe down Stream. iv. Supply and install a new Toshiba magnetic flow meter
- Status
- Closed
- Sector
- Waste Processing and Treatment, Manufacturing (Industrial), Government, Commercial, Water Supply and Storage
- Location
- Goose Creek, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Lower Berkeley Influent Flowmeter
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | SUMMARY: Berkeley County is requesting proposals to provide and install a 36-inch magnetic flowmeter manufactured by Toshiba. The work consists of furnishing all material, labor and equipment. 2. FLOW METER INSTALL a. Meter Installation i. Divert flow to bypass piping. ii. Cut out flange x flange pipe @ FM Area. iii. Remove pipe down Stream. iv. Supply and install a new Toshiba magnetic flow meter, 600 series (model number LF664). v. Replace downstream pipe with a Mega flange adapter. vi. Tou... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Goose Creek |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Manufacturing (Industrial), Government, Commercial, Water Supply and Storage |
Article published date | 2024-08-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
