Lower Booth Riprap
Sector: Government • Location: Fort Pierre, South Dakota, United States of America
Source: Dodge USA
Scope - The Work for the Lower Booth Dam Riprap project consists of the following: Furnish, haul, and place South Dakota Class B ripap at four (4) designated locations on and near the dam as described in the Specifications and Shown on the Drawings. Furnish and place Type B Drainage Fabric under the riprap as described in the Specifications and Shown on the Drawings. Additional South Dakota Class
- Status
- Prospective
- Sector
- Government, Hydro, Manufacturing (Industrial), Commercial, Water Supply and Storage, Waste Processing and Treatment
- Location
- Fort Pierre, South Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Lower Booth Riprap
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope - The Work for the Lower Booth Dam Riprap project consists of the following: Furnish, haul, and place South Dakota Class B ripap at four (4) designated locations on and near the dam as described in the Specifications and Shown on the Drawings. Furnish and place Type B Drainage Fabric under the riprap as described in the Specifications and Shown on the Drawings. Additional South Dakota Class B riprap will be stockpiled at a location designated by the Government. Excavate the streambed an... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Dakota |
City | Fort Pierre |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Government, Hydro, Manufacturing (Industrial), Commercial, Water Supply and Storage, Waste Processing and Treatment |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Government projects in United States of America
- CARTER TOWN ROAD
- DUDLEY-STATE ROUTE 29 ROAD
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- SR 202 FROM THOMAS COUNTY LINE TO SR 111
- CR 210/GLYEN HICKMAN RD FROM SR 117 TO CR 356/AIRPORT RD-TIA
- COLUMBUS VIADUCT RAILROAD BRIDGES.
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SIGNAL COMMUNICATIONS; SERVICE & SUPPORT - FY 2018
