Lower Camp Periyar Hydel Power Project
Sector: Hydro • Location: Tamil Nadu, India
Source: BW Businessworld
The Lower Camp Periyar Hydel Power Project, which depends on water released from the Mullaperiyar dam, has suspended power generation due to a drop in water flow below the minimum required level. The plant has four generators with a total capacity of 168 MW and supplies electricity to key districts in Tamil Nadu. Power generation is expected to resume after water levels improve with the monsoon.
- Status
- Failure
- Sector
- Hydro, Water Supply and Storage, Power Generation (CCGT)
- Location
- Tamil Nadu, India
- Updated
- 22 Jul 2026
- Source
- BW Businessworld
ConstructChat
Ask ConstructChat about Lower Camp Periyar Hydel Power Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | suspended |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Lower Camp Periyar Hydel Power Project, which depends on water released from the Mullaperiyar dam, has suspended power generation due to a drop in water flow below the minimum required level. The plant has four generators with a total capacity of 168 MW and supplies electricity to key districts in Tamil Nadu. Power generation is expected to resume after water levels improve with the monsoon. |
Original sector | Energy |
Location
Country | India |
State | Tamil Nadu |
Source
Source | BW Businessworld |
URL |
More Details
Record type | Project |
Sector | Hydro, Water Supply and Storage, Power Generation (CCGT) |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
