Lower Coddle Creek New Parallel Interceptor
Sector: Metal • Location: Harrisburg, North Carolina, United States of America
Source: Dodge USA
Scope - The proposed sanitary sewer interceptor will be constructed in two phases; the first phase (base bid) extends from Rocky River Road up to Wolf Meadow Creek and the second phase (bid alternate) extends from Wolf Meadow Creek to approximately Coddle Creek Drive SW. In total the two phases will consist of approximately 39 LF of 60 fiberglass pipe, 39 LF of 54 fiberglass pipe, 20,013 LF of 48
- Status
- Closed
- Sector
- Metal, Water Supply and Storage, Road, Waste Processing and Treatment, Government, Steel, Commercial
- Location
- Harrisburg, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Lower Coddle Creek New Parallel Interceptor
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope - The proposed sanitary sewer interceptor will be constructed in two phases; the first phase (base bid) extends from Rocky River Road up to Wolf Meadow Creek and the second phase (bid alternate) extends from Wolf Meadow Creek to approximately Coddle Creek Drive SW. In total the two phases will consist of approximately 39 LF of 60 fiberglass pipe, 39 LF of 54 fiberglass pipe, 20,013 LF of 48 fiberglass and ductile iron pipe, 7,943 LF of 36 fiberglass and ductile iron pipe, 1,395 LF of 30... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Harrisburg |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Water Supply and Storage, Road, Waste Processing and Treatment, Government, Steel, Commercial |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
