Lower Colgan Creek Restoration Phase 3
Sector: Water Supply and Storage • Location: Santa Rosa, California, United States of America
Source: Dodge
This scope of work includes purchase, delivery, site preparation, and placement of Log Structures including all materials, excavation, fill, compaction, rock placement, and anchoring required to install the features at the elevations and locations shown on the Plans and as directed by the Engineer
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Waste Processing and Treatment, Commercial
- Location
- Santa Rosa, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Lower Colgan Creek Restoration Phase 3
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This scope of work includes purchase, delivery, site preparation, and placement of Log Structures including all materials, excavation, fill, compaction, rock placement, and anchoring required to install the features at the elevations and locations shown on the Plans and as directed by the Engineer |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Santa Rosa |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Waste Processing and Treatment, Commercial |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
