logo

Lower Crystal Springs Dam

Sector: Hydro • Location: CA, United States of America (USA)

Source: Anvil Builders

Project

The scope of this project is to improve the flow of water discharged from Crystal Springs Reservoir to San Mateo Creek as native fish were getting caught and dying. This project part of the watershed and involved bypassing and draining a section of the creek. Biologist monitoring of the work was required at all times. To gain access to the work area 2 bypasses were installed from the existing disc

Project Information FAQ

Project Information

3 Q
The project “Lower Crystal Springs Dam” is an infrastructure initiative in the Hydro sector, located in CA, United States of America (USA). Taiyo aggregates data on it from Anvil Builders.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The scope of this project is to improve the flow of water discharged from Crystal Springs Reservoir to San Mateo Creek as native fish were getting caught and dying. This project part of the watershed and involved bypassing and draining a section of the creek. Biologist monitoring of the work was required at all times. To gain access to the work area 2 bypasses were installed from the existing discharge pipes. A dewatering system was then installed, and the creek section was pumped dry. This involved close coordination with the SFPUC who retained biologists to catch all the fish and relocate them to an active part of the creek. Once dry the creek was re-graded and riprap removed/replaced. A 24” ductile iron pipe was slip lined through an abandoned pipe section to provide a new primary discharge location for the creek. Flow control valves were installed on this new discharge output can now be controlled remotely.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data