logo
ProjectProposed

Lower East Chao Phraya Irrigation System Improvement - Climate Adaptive Strengthening Program

The status, timeline and source of this project. A free account opens every field.

Source: Asian Development Bank (ADB)

The Government of Thailand has prepared a detailed masterplan to address climate risks in the Chao Phraya River basin. A sovereign intervention is justified as the private sector traditionally does not engage in flood risk management, nor where there is no direct stream of monetary benefits. The proposed program will use a multitranche financing facility (MFF) lending modality, using time-sliced f

Status
Prospective
Sector
Water Supply and Storage, Residential, Raw Materials, Fertilizers, Commercial, Government
Location
Thailand
Updated
22 Jul 2026
Source
Asian Development Bank (ADB)

ConstructChat

Ask ConstructChat about Lower East Chao Phraya Irrigation System Improvement - Climate Adaptive Strengthening Program

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Lower East Chao Phraya Irrigation System Improvement - Climate Adaptive Strengthening Program” is an infrastructure initiative in the Water Supply and Storage sector, located in Thailand. Taiyo aggregates data on it from Asian Development Bank (ADB).

Participants

Sponsoring Agency

Status

Original status

Proposed

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Government of Thailand has prepared a detailed masterplan to address climate risks in the Chao Phraya River basin. A sovereign intervention is justified as the private sector traditionally does not engage in flood risk management, nor where there is no direct stream of monetary benefits. The proposed program will use a multitranche financing facility (MFF) lending modality, using time-sliced financing. An MFF modality is selected because The proposed project is a very high investment, and the implementation is expected to last longer than six years. The RID estimated an implementation period of four years, which is considered unrealistic, mainly due to significant resettlement. The program includes up to about 60 sub-programs, many of which are similar in nature, to be categorized by dependent time-sliced tranches. All project components will be assessed during processing and divided into 2, or possibly 3 tranches, depending on the Government preferences.

Original sector

Agriculture, natural resources and rural development

Budget

Location

Country

Thailand

Source

Source

Asian Development Bank (ADB)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Residential, Raw Materials, Fertilizers, Commercial, Government

Article published date

2025-01-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project