Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
One of 10,000+ projects Taiyo tracks in Washington.
Source: Broadband USA
The Broadband Infrastructure Deployment project proposes to install two communication shelters and complete site preparation work for future installment of two towers to prepare for broadband deployment to serve 268 unserved Tribal households.
- Status
- Closed
- Sector
- Broadband, Telecommunications, Education, Power Transmission, Power Generation (CCGT), Seaport
- Location
- Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Broadband USA
ConstructChat
Ask ConstructChat about Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Broadband Infrastructure Deployment project proposes to install two communication shelters and complete site preparation work for future installment of two towers to prepare for broadband deployment to serve 268 unserved Tribal households. |
Location
Country | United States of America (USA) |
State | Washington |
Source
Source reliability | High |
Source | Broadband USA |
More Details
Record type | Project |
Sector | Broadband, Telecommunications, Education, Power Transmission, Power Generation (CCGT), Seaport |
Article published date | 2023-12-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Broadband projects in United States of America
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- MODIFY EXISTING WIRELESS FACILITY, REMOVE (2) TMA'S, INSTALL (1) RRU , REMOVE (2) DIPLEXERS & UTILITY STANDS, REMOVE (2)
- TEMPORARY USE FOR TEMPORARY FACILITY - CELL SITE ON WHEELS (COW) FOR VERIZON WIRELESS - 67-FEET TALL
- DISH WIRELESS WILL BE PERFORMING A 1ST TIME INSTALL AT AN EX ISTING COMM FACILITY. ADDING 3 ANTENNA AND 6 RRU TO TOP OF T
