logo

LOWER FAYETTEVILLE RD FM GRIESON TRAIL TO FISCHER RD- GRTA

Sector: Hydro • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Under Construction

The proposed project would consist of maintenance and operational improvements along Lower Fayetteville Road from Greison Trail to SR 54 (Fischer Road) in Coweta County. The existing 2-lane roadway's pavement would be widened 2 feet on each side, except in the area of the Chandler's Lake Dam where all widening would occur on the southern side of the roadway. The project would include leveling an

Project Information FAQ

Project Information

4 Q
The project “LOWER FAYETTEVILLE RD FM GRIESON TRAIL TO FISCHER RD- GRTA” is an infrastructure initiative in the Hydro sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed project would consist of maintenance and operational improvements along Lower Fayetteville Road from Greison Trail to SR 54 (Fischer Road) in Coweta County. The existing 2-lane roadway's pavement would be widened 2 feet on each side, except in the area of the Chandler's Lake Dam where all widening would occur on the southern side of the roadway. The project would include leveling and resurfacing of the roadway, as well as shoulder improvements. The intersections of Lower Fayetteville Road with Sullivan Road, Lora Smith Road, and Parks Road would be improved to include turn lanes. The proposed project would generally be constructed within the existing 80-foot right-of-way, except at the intersections, which are to be improved. Approx. 20 feet of right-of-way will be acquired at each intersection. The total project length is approx. 9.65 miles. Traffic would be maintained on the existing roadways during construction. This is a local let GRTA Arterial project.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data