Lower Kennebec River Dredging
Sector: Metal • Location: Phippsburg, Maine, United States of America
Source: Dodge USA
The work involves maintenance dredging for the USN of two portions of the authorized, 27-foot deep, 500-foot wide FNP in the lower Kennebec River. Dredging is required to meet the navigational requirements of newly constructed surface combatants being built and tested at Bath Iron Works. The work will restore the channel to its authorized dimensions and involves removal of a total of about 50,000
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The work involves maintenance dredging for the USN of two portions of the authorized, 27-foot deep, 500-foot wide FNP in the lower Kennebec River. Dredging is required to meet the navigational requirements of newly constructed surface combatants being built and tested at Bath Iron Works. The work will restore the channel to its authorized dimensions and involves removal of a total of about 50,000 cubic yards (cy) of clean sand. Approximately 40,000 cy of material will be removed from the Doub... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Metal projects in United States of America
- PARTIAL METAL BEAM REPLACEMENT DUE TO FIRE DAMAGE, ROOF REPLACEMENT WORK DUE TO FIRE DAMAGE
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- TO CONSTRUCT 15,000 SF PRE-FAB METAL BUILDING AND ASSOCIATED SITE IMPROVEMENTS (1069 & 1089 INDUSTRIAL)
- Willard InterContinental Hotel
- Pacific Visions Wing at the Aquarium of the Pacific
- WilmerHale Tenant Fit-Out
- UW Seismic Improvements
- Crystal City Substation Improvement and Expansion
