Lower Lee Road
Sector: Commercial • Location: Nevada, United States of America
Source: Dodge USA
This Project commences at the Elko County Limit where Lower Lee Road and Old Nevada 228 meet and follows the Lower Lee Road alignment for approximately 1.37 miles to the South Fork tribal boundary. The Project will consist of a full depth reclamation (FDR) which includes pulverizing the existing roadbed, cement stabilization and asphalt paving along the existing alignment.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This Project commences at the Elko County Limit where Lower Lee Road and Old Nevada 228 meet and follows the Lower Lee Road alignment for approximately 1.37 miles to the South Fork tribal boundary. The Project will consist of a full depth reclamation (FDR) which includes pulverizing the existing roadbed, cement stabilization and asphalt paving along the existing alignment. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Commercial projects in United States of America
- 2023 Citywide Pedestrian Safety Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
- FCS Child Care Project
- Brotman Hall (BH) Suite 377 Renovation
- Fine Arts and Housing Cooling Engineering Study
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
