Lower Lee Road
One of 10,000+ projects Taiyo tracks in Nevada.
Source: Dodge USA
This Project commences at the Elko County Limit where Lower Lee Road and Old Nevada 228 meet and follows the Lower Lee Road alignment for approximately 1.37 miles to the South Fork tribal boundary. The Project will consist of a full depth reclamation (FDR) which includes pulverizing the existing roadbed, cement stabilization and asphalt paving along the existing alignment.
- Status
- Closed
- Sector
- Commercial, Road, Government
- Location
- Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Lower Lee Road
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This Project commences at the Elko County Limit where Lower Lee Road and Old Nevada 228 meet and follows the Lower Lee Road alignment for approximately 1.37 miles to the South Fork tribal boundary. The Project will consist of a full depth reclamation (FDR) which includes pulverizing the existing roadbed, cement stabilization and asphalt paving along the existing alignment. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nevada |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Road, Government |
Article published date | 2024-03-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
