Lower Solu Hydropower Project
Completed · Nepal · Last reported Jul 2025
Source: myRepublica
The 82-MW Lower Solu Hydropower Project located at Solukhola is connected to the national power transmission grid through the 132 kV double circuit transmission line of the Solu Corridor via the Tingla Substation.
- Status
- Closed
- Sector
- Power Generation (CCGT), Hydro
- Location
- Solukhumbu, Nepal
- Updated
- 22 Jul 2026
- Source
- myRepublica
ConstructChat
Ask ConstructChat about Lower Solu Hydropower Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The 82-MW Lower Solu Hydropower Project located at Solukhola is connected to the national power transmission grid through the 132 kV double circuit transmission line of the Solu Corridor via the Tingla Substation. |
Original sector | Energy |
Location
Country | Nepal |
City | Solukhumbu |
Source
Source | myRepublica |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Hydro |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
