logo
ProjectUnder Construction

Lower Solukhola Hydropower Project

The owner, status and timeline of this project. A free account opens every field.

Source: myRepublica

The Lower Solukhola Hydropower project, with a capacity of 82 megawatts, is nearing completion with 95 percent physical progress. Key components such as the power house, tunnel way, and installation of turbine and generator have been completed.

Status
Under Construction
Sector
Power Generation (CCGT), Tunnel, Wind, Hydro
Location
Nepal
Updated
22 Jul 2026
Source
myRepublica

ConstructChat

Ask ConstructChat about Lower Solukhola Hydropower Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Lower Solukhola Hydropower Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Nepal. Taiyo aggregates data on it from myRepublica.

Participants

Not available for this record.

Status

Original status

Under Construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Lower Solukhola Hydropower project, with a capacity of 82 megawatts, is nearing completion with 95 percent physical progress. Key components such as the power house, tunnel way, and installation of turbine and generator have been completed.

Location

Country

Nepal

Source

Source

myRepublica

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Tunnel, Wind, Hydro

Article published date

2025-02-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project