Lower Solukhola Hydropower Project
The owner, status and timeline of this project. A free account opens every field.
Source: myRepublica
The Lower Solukhola Hydropower project, with a capacity of 82 megawatts, is nearing completion with 95 percent physical progress. Key components such as the power house, tunnel way, and installation of turbine and generator have been completed.
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Tunnel, Wind, Hydro
- Location
- Nepal
- Updated
- 22 Jul 2026
- Source
- myRepublica
ConstructChat
Ask ConstructChat about Lower Solukhola Hydropower Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Lower Solukhola Hydropower project, with a capacity of 82 megawatts, is nearing completion with 95 percent physical progress. Key components such as the power house, tunnel way, and installation of turbine and generator have been completed. |
Location
Country | Nepal |
Source
Source | myRepublica |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Tunnel, Wind, Hydro |
Article published date | 2025-02-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
