Lower Solukhola Hydropower Project
Sector: Hydro • Location: Nepal
Source: The Rising Nepal
The Lower Solukhola Hydropower project is an 82 megawatt capacity hydroelectric project located in Tingla, Solukhumbu. It has achieved 95 percent physical progress and is expected to launch commercial production in July 2025. The project includes the construction of a powerhouse, tunnel way, and installation of turbine and generator, with significant progress on the transmission line as well.
- Status
- Under Construction
- Sector
- Hydro, Tunnel, Commercial, Wind
- Location
- Nepal
- Updated
- 22 Jul 2026
- Source
- The Rising Nepal
ConstructChat
Ask ConstructChat about Lower Solukhola Hydropower Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Lower Solukhola Hydropower project is an 82 megawatt capacity hydroelectric project located in Tingla, Solukhumbu. It has achieved 95 percent physical progress and is expected to launch commercial production in July 2025. The project includes the construction of a powerhouse, tunnel way, and installation of turbine and generator, with significant progress on the transmission line as well. |
Original sector | Energy |
Budget |
Location
Country | Nepal |
Source
Source | The Rising Nepal |
URL |
More Details
Record type | Project |
Sector | Hydro, Tunnel, Commercial, Wind |
Article published date | 2025-02-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
