logo
ProjectOperational

Lower Subansiri Hydropower Project

One of 2,330 projects Taiyo tracks in Arunachal Pradesh.

Source: Northeast Today

The Lower Subansiri Hydropower Project is a 2,000 MW run-of-the-river hydropower project on the Subansiri River in Arunachal Pradesh, India. It features a 116-metre-high concrete gravity dam, eight units of 250 MW each, and is designed to generate 7,422 million units of renewable electricity annually. The project also provides flood moderation and water management benefits and aims to develop the

Status
Under Construction
Sector
Water Supply and Storage, Cement, Hydro, Power Generation (CCGT), Hotel
Location
Itanagar, Arunachal Pradesh, India
Updated
22 Jul 2026
Source
Northeast Today

ConstructChat

Ask ConstructChat about Lower Subansiri Hydropower Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Lower Subansiri Hydropower Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Itanagar, Arunachal Pradesh, India. Taiyo aggregates data on it from Northeast Today.

Participants

Not available for this record.

Status

Original status

operational

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Lower Subansiri Hydropower Project is a 2,000 MW run-of-the-river hydropower project on the Subansiri River in Arunachal Pradesh, India. It features a 116-metre-high concrete gravity dam, eight units of 250 MW each, and is designed to generate 7,422 million units of renewable electricity annually. The project also provides flood moderation and water management benefits and aims to develop the reservoir into a major water tourism destination.

Original sector

Energy

Location

Country

India

State

Arunachal Pradesh

City

Itanagar

Source

Source

Northeast Today

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Cement, Hydro, Power Generation (CCGT), Hotel

Article published date

2026-03-31

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project