logo

Lower Zakum Long-Term Development Phase 1 - Package 5 Engineering Design

Sector: Oil and Gas • Location: United Arab Emirates

Source: euro-petrole.com

Project
Awarded

Wood has been contracted to deliver the engineering design for Package 5 of ADNOC Offshore's Lower Zakum Long-Term Development Phase 1 project, which involves offshore oil and gas development.

Status
Closed
Sector
Oil and Gas, Government
Location
United Arab Emirates
Updated
22 Jul 2026
Source
euro-petrole.com

ConstructChat

Ask ConstructChat about Lower Zakum Long-Term Development Phase 1 - Package 5 Engineering Design

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Lower Zakum Long-Term Development Phase 1 - Package 5 Engineering Design” is an infrastructure initiative in the Oil and Gas sector, located in United Arab Emirates. Taiyo aggregates data on it from euro-petrole.com.

Participants

Sponsoring Agency

Status

Original status

Awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Wood has been contracted to deliver the engineering design for Package 5 of ADNOC Offshore's Lower Zakum Long-Term Development Phase 1 project, which involves offshore oil and gas development.

Original sector

Oil and Gas

Location

Country

United Arab Emirates (UAE)

Source

Source

euro-petrole.com

URL

More Details

Record type

Project

Sector

Oil and Gas, Government

Article published date

2025-05-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project