Lower Zakum Long-Term Development Phase 1 Package 5 Engineering Design
Sector: Oil and Gas • Location: United Arab Emirates
Source: Oil Review Middle East
Engineering design contract for Package 5 of ADNOC Offshore's Lower Zakum Long-Term Development Phase 1 (LTDP1) project, including detailed engineering design for new oil processing trains, separation, desalter, dehydration, oil stabilisation system, a new seawater offshore platform, and related utility facilities on Das Island, UAE.
- Status
- Closed
- Sector
- Oil and Gas, Power Transmission, Power Generation (CCGT), Wind, Government
- Location
- United Arab Emirates
- Updated
- 22 Jul 2026
- Source
- Oil Review Middle East
ConstructChat
Ask ConstructChat about Lower Zakum Long-Term Development Phase 1 Package 5 Engineering Design
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Engineering design contract for Package 5 of ADNOC Offshore's Lower Zakum Long-Term Development Phase 1 (LTDP1) project, including detailed engineering design for new oil processing trains, separation, desalter, dehydration, oil stabilisation system, a new seawater offshore platform, and related utility facilities on Das Island, UAE. |
Original sector | Oil and Gas |
Budget |
Location
Country | United Arab Emirates (UAE) |
Source
Source | Oil Review Middle East |
URL |
More Details
Record type | Project |
Sector | Oil and Gas, Power Transmission, Power Generation (CCGT), Wind, Government |
Article published date | 2025-05-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
