LPS Central Office Paving Phase 2
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Asphalt pavement reconstruction and repairs Site re-grading The scope includes, but is not limited to, the following: a. 79,000 square feet of full depth, heavy duty asphalt pavement removal and replacement patchwork. b. 59,000 square feet of full depth, standard duty asphalt pavement removal and replacement patchwork. c. Installation of concrete box outs and drain tiles around existing drainage s
- Status
- Prospective
- Sector
- Cement, Government, Road, Residential, Manufacturing (Industrial), Commercial, Waste Processing and Treatment
- Location
- Livonia, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about LPS Central Office Paving Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Asphalt pavement reconstruction and repairs Site re-grading The scope includes, but is not limited to, the following: a. 79,000 square feet of full depth, heavy duty asphalt pavement removal and replacement patchwork. b. 59,000 square feet of full depth, standard duty asphalt pavement removal and replacement patchwork. c. Installation of concrete box outs and drain tiles around existing drainage structures, and repair of existing concrete box outs where necessary. Installation of 6 concrete b... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Livonia |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Cement, Government, Road, Residential, Manufacturing (Industrial), Commercial, Waste Processing and Treatment |
Article published date | 2025-02-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
