LSU AgCenter Project
Sector: Raw Materials
Source: Baton Rouge Business Report
A $22 million project involving the LSU AgCenter has been paused while the Trump administration reviews spending at the U.S. Agency for International Development. The project is part of the Feed the Future Climate Resilient Cereals Innovational Lab, which aims to improve the availability of cereal crops to those at risk of hunger.
- Status
- Failure
- Sector
- Raw Materials
- Updated
- 22 Jul 2026
- Source
- Baton Rouge Business Report
ConstructChat
Ask ConstructChat about LSU AgCenter Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | On Hold |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A $22 million project involving the LSU AgCenter has been paused while the Trump administration reviews spending at the U.S. Agency for International Development. The project is part of the Feed the Future Climate Resilient Cereals Innovational Lab, which aims to improve the availability of cereal crops to those at risk of hunger. |
Budget |
Location
| Not available for this record. |
Source
Source | Baton Rouge Business Report |
URL |
More Details
Record type | Project |
Sector | Raw Materials |
Article published date | 2025-02-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects
- SR 138@CR 55/NUNNALLY FARM RD RT TURN LN
- Bayer Park Mural
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
- ROOFTOP SOLAR PV INSTALL. (8) 400W MODULES AT 3.2 KW TOTAL. INSTALL (1) (N) ESS TELSA POWERWALL BATTERY AT 13.5 KWH.
- LIVESTOCK AMENDMENTS
- CUP AND MSPR FOR NEW INDUSTRIAL CAMPUS WITH 2 SHELL BUILDING (232,653 AND 154,618 SF) AT FORMER BERKELEY FARMS SITE
- VINYL-LINER SWIMMING POOL LOCATED IN REAR YARD
