LSU Construction & Advanced Manufacturing Building
Pre-design · Louisiana · Last reported Oct 2024
Source: Dodge USA
The Construction & Advanced Manufacturing Building will be located on South Stadium Drive, across the street from Tiger Stadium. It will be the home of construction management, which will relocate from Patrick F. Taylor Hall, and will offer new and enhanced labs for research that will address challenges in construction -This critical infrastructure project is pivotal to achieving this vision and e
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Stadium, Commercial, Road, Education, Residential
- Location
- Baton Rouge, Louisiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about LSU Construction & Advanced Manufacturing Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Construction & Advanced Manufacturing Building will be located on South Stadium Drive, across the street from Tiger Stadium. It will be the home of construction management, which will relocate from Patrick F. Taylor Hall, and will offer new and enhanced labs for research that will address challenges in construction -This critical infrastructure project is pivotal to achieving this vision and expanding LSU s overall engineering corridor, aiming to ensure that Louisiana remains a leader in ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Louisiana |
City | Baton Rouge |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Stadium, Commercial, Road, Education, Residential |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
