logo

L&T Deccan Tollways Limited

Sector: Road • Location: India

Source: World Bank Group

Project
Active

it L&T Infrastructure Development Projects Limited (LTIDPL) was awarded a 25 year concession (including construction period of 30 months) to for the strengthening, improvement, four-laning, operation and maintenance, and tolling of 145 kms of road connecting Sangareddy to Karnataka/Maharashtra section from KM 348.000 to KM 493.000 of NH-9 from in the states of Andhra Pradesh and Karnataka,in Novem

Project Information FAQ

Project Information

4 Q
The project “L&T Deccan Tollways Limited” is an infrastructure initiative in the Road sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

it L&T Infrastructure Development Projects Limited (LTIDPL) was awarded a 25 year concession (including construction period of 30 months) to for the strengthening, improvement, four-laning, operation and maintenance, and tolling of 145 kms of road connecting Sangareddy to Karnataka/Maharashtra section from KM 348.000 to KM 493.000 of NH-9 from in the states of Andhra Pradesh and Karnataka,in November 2011. The government granting authority was the National Highway Authority of India (NHAI). L&T IDPL established L&T Deccan Tollways Limited (L&T DTL), a special purpose vehicle, to implement this project. The SPV won the tender through competitive bidding, conducted by NHAI, by quoting the highest premium payment to NHAI. The SPV would pay NHAI a sum of of US$ 16mn (INR 800.1mn @50 INR/USD) in the first year of operations with 5% increase in each subsequent year (This amounted to an NPV payout of US$ 228.4mn over a concession period of 25 years at a discount rate of 10%). There were 37 pre-qualified bidders out of which 19 bidders offered their final bids. The L2 bidder Ramky Infrastructure had quoted a premium of about INR 750.6mn. Under the contract, L&T IDPL was responsible for the design, construction, finance, operation and maintenance and strengthening of the existing 2-lane highway to a 4-lane highway with paved shoulders. The SPV was to recover the capital costs and operating costs including returns through tolling during the term of concession. L&T would execute the EPC contract for this project. The total project cost (i.e. the investment in physical assets) was USD $219.5 million (INR 13.9 billion) to be funded in debt to equity ratio of 78:22. Financing comprises USD $172.1million (INR 10.9 billion) 17-year term loan and USD $47.4 million (INR 3.1 billion) equity. IDBI is the MLA, bookrunner, facility agent and documentation agent. Financial close occurred on 7 July 2015. i) Dealogic Report ii) Sponsor website iii) http://nhai.org.in/spw/ConcessionaireDetails/DOC050111-007.pdf iv) Factiva

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data