Active

On 27 Jun 2008, Brazil's federal power regulator, Aneel, held an open auction for 19 transmission lines and 20 substations. The lines were to increase connectivity between Manaus in northern Amazonas state to the national grid. The bidding variable was the lowest annual revenue. Spain's Isolux Corsan won the bid for two lots of transmission lines totaling 1,240km long and five substations under a

Status
Prospective
Sector
Power Generation (CCGT), Government, Commercial
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about LT Tucurui - Jurupari and LT Oriximana - Jurupari

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “LT Tucurui - Jurupari and LT Oriximana - Jurupari” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

On 27 Jun 2008, Brazil's federal power regulator, Aneel, held an open auction for 19 transmission lines and 20 substations. The lines were to increase connectivity between Manaus in northern Amazonas state to the national grid. The bidding variable was the lowest annual revenue. Spain's Isolux Corsan won the bid for two lots of transmission lines totaling 1,240km long and five substations under a 30-year BOT contract. The bids were: BRL74.3m for Tucurui-Xingu-Jurupari; BRL71.8m for Oriximina-Jurupari and Jurupari-Laranjal-Macapa in annual fees. The government approved the 30-year BOT contract in October 2008. In August 2010, construction permits were issued. The transmission lines to be built were: 527km, 500kV Tucurui-Xingu-Jurupari transmission line along with the 500/230kV Xingu and Jurupari substations in Para state; and 374km, 500kV Oriximina-Jurupari transmission line plus 339km, 230kV Jurupari-Laranjal-Macapa transmission line including 230/69kV Macapa, Larajal and Oriximina substations in Para and Amapa states. The sponsor created the special purpose company Linhas de Macapa Transmissora de Energia S.A. to lead the project. The total project cost was approximately BRL 1.953 billion (US $1.109 billion). In October 2010, Banco da Amazonia approved a loan for BRL 1.465 billion. The project was expected to become operational in July 2011, but commercial operations commenced only in May 2014.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Government, Commercial

Article published date

2024-10-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project