LTBB Existing Recycling Stations Upgrades
One of 10,000+ projects Taiyo tracks in Michigan.
Source: Dodge
A. Work closely with LTBB Environmental Services Staff on specific areas that need updating and/or improved and to schedule work being performed B. Obtain the necessary equipment, supplies, and materials to accomplish remodel C. Permits from LTBB Planning will be required for this project. Inspections will be required, and inspector information will be provided by the LTBB Planning Department. D.
- Status
- Closed
- Sector
- Waste Processing and Treatment, Seaport, Water Supply and Storage, Commercial, Government
- Location
- Harbor Springs, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about LTBB Existing Recycling Stations Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A. Work closely with LTBB Environmental Services Staff on specific areas that need updating and/or improved and to schedule work being performed B. Obtain the necessary equipment, supplies, and materials to accomplish remodel C. Permits from LTBB Planning will be required for this project. Inspections will be required, and inspector information will be provided by the LTBB Planning Department. D. Erect safety barriers for staff working on site during upgrades and signage to cordon off work ar... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Harbor Springs |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Seaport, Water Supply and Storage, Commercial, Government |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
