logo
ProjectActive

LTL Belihul Oya SHPP

Active · Sri Lanka

Source: World Bank Group

LTL Holdings, via its subsidiary Nividhu, was developing the 2.2MW Belihul Oya mini hydropower plant. The project consists of two turbines, supplied from Germany. Lakdhanavi Limited was a fully owned subsidiary of Lanka Transformer Limited (LTL). LTL was owned by Ceylon Electricity Board (majority shareholder), ABB Group (27%) of Switzerland (Asea Brown Boveri (ABB)) and an Employees Trust (see pr

Status
Prospective
Sector
Hydro, Wind, Power Generation (CCGT), Government, Commercial
Location
Sri Lanka
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about LTL Belihul Oya SHPP

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “LTL Belihul Oya SHPP” is an infrastructure initiative in the Hydro sector, located in Sri Lanka. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

LTL Holdings, via its subsidiary Nividhu, was developing the 2.2MW Belihul Oya mini hydropower plant. The project consists of two turbines, supplied from Germany. Lakdhanavi Limited was a fully owned subsidiary of Lanka Transformer Limited (LTL). LTL was owned by Ceylon Electricity Board (majority shareholder), ABB Group (27%) of Switzerland (Asea Brown Boveri (ABB)) and an Employees Trust (see project 3814). The project capacity factor is 47%, generating 10.4GWh annually. SN Power, from Norway held 30% in the project. LTL held 48%. Lanka Ventures (venture capital firm) held 16%, and Employees Trust held 4%. Construction started in March 2001. The project commissioned in April 2002. The project holds a 15 year PPA with the Ceylon Electricity Board. The operator of the project was Lakdhanavi Ltd. Total cost was US$1.87 million. Financial closure date was unknown, but ESTIMATED here was July 2001 (25% completion rule). The project applied for UNFCCC CDM financing together with the Assupiniella plant (project 7002). Financing was provided by a consortium of Sri Lankan banks (non-recourse). Private ownership level is SN Power (30%), plus 27% of LTL which owns 48% of the project. The coordinates are: Longitude / Latitude: N 06º 45” 01’ / E 80º 45’ 19” http://www.snpower.com/projects-and-plants/sri-lanka/belihuloya/ http://www.dnv.com/focus/climate_change/upload/pdd%20belihul%20oya_assupiniela%20.pdf

Original sector

Energy

Budget

Location

Country

Sri Lanka

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Hydro, Wind, Power Generation (CCGT), Government, Commercial

Article published date

2024-09-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project