LTL Belihul Oya SHPP
Sector: Hydro • Location: Sri Lanka
Source: World Bank Group
LTL Holdings, via its subsidiary Nividhu, was developing the 2.2MW Belihul Oya mini hydropower plant. The project consists of two turbines, supplied from Germany. Lakdhanavi Limited was a fully owned subsidiary of Lanka Transformer Limited (LTL). LTL was owned by Ceylon Electricity Board (majority shareholder), ABB Group (27%) of Switzerland (Asea Brown Boveri (ABB)) and an Employees Trust (see pr
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | LTL Holdings, via its subsidiary Nividhu, was developing the 2.2MW Belihul Oya mini hydropower plant. The project consists of two turbines, supplied from Germany. Lakdhanavi Limited was a fully owned subsidiary of Lanka Transformer Limited (LTL). LTL was owned by Ceylon Electricity Board (majority shareholder), ABB Group (27%) of Switzerland (Asea Brown Boveri (ABB)) and an Employees Trust (see project 3814). The project capacity factor is 47%, generating 10.4GWh annually. SN Power, from Norway held 30% in the project. LTL held 48%. Lanka Ventures (venture capital firm) held 16%, and Employees Trust held 4%. Construction started in March 2001. The project commissioned in April 2002. The project holds a 15 year PPA with the Ceylon Electricity Board. The operator of the project was Lakdhanavi Ltd. Total cost was US$1.87 million. Financial closure date was unknown, but ESTIMATED here was July 2001 (25% completion rule). The project applied for UNFCCC CDM financing together with the Assupiniella plant (project 7002). Financing was provided by a consortium of Sri Lankan banks (non-recourse). Private ownership level is SN Power (30%), plus 27% of LTL which owns 48% of the project. The coordinates are: Longitude / Latitude: N 06º 45” 01’ / E 80º 45’ 19” http://www.snpower.com/projects-and-plants/sri-lanka/belihuloya/ http://www.dnv.com/focus/climate_change/upload/pdd%20belihul%20oya_assupiniela%20.pdf |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
