Lucie Stern Community Center Irrigation Lines Replacement
Pre-design · California · Last reported Aug 2025
Source: Dodge
This project provides funding for the replacement of main irrigation lines at the Lucie Stern Community Center. The existing main line was installed in 1971 and is at the end of its useful life City of Palo Alto may be seeking Design for This project provides funding for the replacement of main irrigation lines at the Lucie Stern Community Center. The existing main line was installed in 1971 and i
- Status
- Prospective
- Sector
- Water Supply and Storage, Raw Materials, Commercial, Government
- Location
- Palo Alto, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Lucie Stern Community Center Irrigation Lines Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project provides funding for the replacement of main irrigation lines at the Lucie Stern Community Center. The existing main line was installed in 1971 and is at the end of its useful life City of Palo Alto may be seeking Design for This project provides funding for the replacement of main irrigation lines at the Lucie Stern Community Center. The existing main line was installed in 1971 and is at the end of its useful life. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Palo Alto |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Raw Materials, Commercial, Government |
Article published date | 2025-08-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
