Lucknow To Kanpur Expressway
Sector: Bridge • Location: Lucknow, Kanpur, Uttar Pradesh, India
Source: Megaproject
The expressway uses Automated Machine Guidance Systems for precision construction and a Multi-Lane Free Flow tolling system that allows vehicles to pass without stopping as tolls are deducted via FASTag and Automatic Number Plate Recognition. Safety features include more than 80 high-definition CCTV cameras, 16 Video Incident Detection Systems, speed radars and a centralised traffic management sys
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The expressway uses Automated Machine Guidance Systems for precision construction and a Multi-Lane Free Flow tolling system that allows vehicles to pass without stopping as tolls are deducted via FASTag and Automatic Number Plate Recognition. Safety features include more than 80 high-definition CCTV cameras, 16 Video Incident Detection Systems, speed radars and a centralised traffic management system that can detect violations and issue e-challans automatically. More than 46,000 saplings have been planted along the alignment. Conceived in 2018 and completed after 1,648 days, the project had its foundation stone laid in March 2019 and was declared NE-6 in December 2020. Developed by PNC Infratech for the National Highways Authority of India, it was executed in two packages: an 18-km elevated corridor linking Amausi and Shaheed Path and a 45-km greenfield section traversing 11 villages in Lucknow and 31 villages in Unnao. Construction accelerated after land acquisition was finalised. At the inauguration the Union minister directed officials to prepare a Detailed Project Report for a 23-km three-tier corridor from Lucknow airport via Shaheed Path to Faizabad Road that would combine an elevated roadway with an electric mass rapid transit system and use Malaysian technology to permit 120-metre spans between piers instead of conventional 30 metres, reducing construction costs by nearly 30 per cent. Leaders also sought six-laning of the Lucknow-Sitapur road and improved service roads. Authorities said the expressway will serve commuters, strengthen the State Capital Region, improve logistics and attract industrial investment. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
