Lucknow Varanasi Tollways Private Limited

Sector: Commercial • Location: India

Source: World Bank Group

Project
Cancelled

In October 2011, the National Highway Authority of India (NHAI) awarded a 23-year concession (including construction period of 30 months) to a consortium of Atlanta Limited and Essar Projects (India) Limited for the strengthening, improvement, four-laning, operation and maintenance, and tolling of 125.9 kms of Lucknow–Sultanpur section of NH-56 from KM 11.500 to KM 134.700 in the state of Uttar Pr

Project Information FAQ

Project Information

5 Q
The project “Lucknow Varanasi Tollways Private Limited” is an infrastructure initiative in the Commercial sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Cancelled

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In October 2011, the National Highway Authority of India (NHAI) awarded a 23-year concession (including construction period of 30 months) to a consortium of Atlanta Limited and Essar Projects (India) Limited for the strengthening, improvement, four-laning, operation and maintenance, and tolling of 125.9 kms of Lucknow–Sultanpur section of NH-56 from KM 11.500 to KM 134.700 in the state of Uttar Pradesh. The project was covered in the districts of Sultanpur, Pratapgarh and Varanasi in Uttar Pradesh. Under the contract, the consortium was responsible for the design, construction, finance, operation and maintenance and strengthening of the existing 2-lane carriageway to a 4-lane highway with paved shoulders. The scope would include construction of new pavement, rehabilitation of existing pavement, construction and/or rehabilitation of major and minor bridges, culverts, road intersections,bypass, flyovers, interchanges, drains, toll plazas etc.The expansion project was part of National Highway Development Project Phase-IVA. This project would reduce the time and cost of travel for traffic, particularly heavy traffic, plying between Sultanpur and Varanasi. NH 56 was an important link connecting two major cities of Lucknow and Varanasi. Gosaiganj, Haidergarh, Musafirkhana and Jagdishpur Industrial area are major settlements along the project road. Lucknow is a major marketing and trading center in North India. The consortium of Atlanta Limited (49%) and Essar Projects India Limited (51%) established Lucknow Varanasi Tollways Private Limited, a special purpose vehicle, to implement this project. The SPV won the tender through competitive bidding, conducted by NHAI, by quoting the highest premium payment to NHAI. The SPV would pay NHAI a sum of US$ 1.9mn (INR 96mn @50 INR/USD) in the first year of operations with 5% increase in each subsequent year (This amounted to an NPV payout of US$ 26mn over the concession period at a discount rate of 10%). Out of the 34 pre-qualified bidders, 12 developers offered their final bids for this project. Under the contract, the SPV was to recover the capital costs and operating costs including returns through tolling during the term of concession. Atlanta Limited would execute the EPC contract for this project. The project attained financial closure on 11th July 2012. The debt/equity ratio of the project was 70/30. The estimated capital cost of the project at the time of financial closure was US$ 279.1 (INR 13955.4mn @50 INR/USD) million. Financing included term loan of US$ 195.4mn (INR 9768.8mn) and sponsor equity of US$ 83.7mn(INR 4186.6). The lead arranger for the term loan was Punjab National Bank. Construction on the project was expected to begin in October 2012 (Appointed Date) and get completed by June 2015. However LVTPL had backed out of the project citing lack of viability of the project under the severe economic downturn and the associated upfront premium payment to NHAI. Although NHAI had agreed to defer premium payments (inspite of reported aggressive bids by developers) to help concessionaires to use cashflows from the initial few years for equity commitments for the project, LVTPL failed to start the work. Finally NHAI had terminated the Concession in October 2013.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data