logo

Ludesa Small Power Plant

Sector: Commercial • Location: Brazil

Source: World Bank Group

Project
Active

The Brazilian company Ludesa Energetica S.A. was granted a 30-year authorization by the federal regulator Aneel the contract to build and operate a 30-MW small hydro power plant located in the Chapeco River, state of Santa Catarina (between the municipalities of Abelardo Luz and Sao Domingos).

The contract was signed with ANEEL in December 2002. In March 2006, the company´s shares were transferre

Project Information FAQ

Project Information

5 Q
The project “Ludesa Small Power Plant” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Brazilian company Ludesa Energetica S.A. was granted a 30-year authorization by the federal regulator Aneel the contract to build and operate a 30-MW small hydro power plant located in the Chapeco River, state of Santa Catarina (between the municipalities of Abelardo Luz and Sao Domingos). The contract was signed with ANEEL in December 2002. In March 2006, the company´s shares were transferred from Indústria de Papel L. Dall'Astra Ltda. - IPDL to Ludesa Holding Ltda (55%) and to Mr. Guilherme Weege (45%). In June 2010, the shareholding structure was altered as Dobreve Energia acquired 60% os the shares of Ludesa; the remaining 40% remained in the control of Ludesa Holding Ltda. Ludesa Energetica S.A. committed to invest US$ 40.3 million (BRL 98 million) in the construction of PCH Ludesa. Financial closure for the project was reached in December 2005, when the company was granted a US$ 29.6 million (BRL 72.1 million) syndicated loan by the state owned bank BNDES. The remaining cost was set to be financed with the sponsors’ internal resources. Construction works on this power plant started in 2006, and the unit became operational in 2007. PCH Ludesa signed a power purchase agreement with the state-owned company Eletrobras for 20 years through the Brazilian Federal program PROINFA (incentive program for alternative power generating companies). In February 2014, CPFL Renovaveis, a subsidiary of the Brazilian company CPFL Energia, acquired 100% of Dobreve's shares.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data