Lufubu Hydropower Project
Closed · Zambia
Source: United Nations Industrial Development Organization (UNIDO)
The Lufubu hydropower scheme Project is a new project to be developed on the Lufubu River Basin in Mpulungu and Nsama District of Northern Province. It is aimed at strengthening the national grid supply and stability, contributing to economic growth as well as unlocking tourism and investment potential in the northern part of Zambia. The Lufubu River runs through the Northern Province and is one o
- Status
- Closed
- Sector
- Hotel, Power Generation (CCGT), Hydro, Rail, Government, Water Supply and Storage, Manufacturing (Industrial)
- Location
- Kalulushi, Zambia
- Updated
- 22 Jul 2026
- Source
- United Nations Industrial Development Organization (UNIDO)
ConstructChat
Ask ConstructChat about Lufubu Hydropower Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Lufubu hydropower scheme Project is a new project to be developed on the Lufubu River Basin in Mpulungu and Nsama District of Northern Province. It is aimed at strengthening the national grid supply and stability, contributing to economic growth as well as unlocking tourism and investment potential in the northern part of Zambia. The Lufubu River runs through the Northern Province and is one of the inflows into Lake Tanganyika. The proposed Hydropower cascade scheme project will consist of a cascade of three (3) power plants to be constructed along the Lufubu River and these will be; the Lufubu 1 (installed phase 1 capacity of 66MW), Lufubu 2 (43MW) and Lufubu 3 (54MW) giving a total phase 1 installed capacity of 163MW. The power plants will be interconnected by 132kV transmission lines. The project has a 4-year construction period. The project is expected to succeed not only because it is profitable (with EBITDA projected at USD118.4m in year 1 of operations and increasing at a projected 2% per annum) and readily available market, but also the project site offers higher and more consistent rainfall patterns than the southern parts of Zambia, where all the country’s major hydropower stations are concentrated. The project is available for FDI through a minority stake. The Lufubu Power Company Limited seeks to meet the cost of construction, acquisition and installations of the Hydropower generation plant and all other project development costs estimated at US$700 million through project financing arrangement to be sourced in form of equity or a loan facility. |
Original sector | Production, transmission and distribution of electricity |
Location
Country | Zambia |
City | Kalulushi |
Source
Source reliability | High |
Source | United Nations Industrial Development Organization (UNIDO) |
URL |
More Details
Record type | Project |
Sector | Hotel, Power Generation (CCGT), Hydro, Rail, Government, Water Supply and Storage, Manufacturing (Industrial) |
Article published date | 2023-05-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hotel projects in Zambia
- RISE AND SHINE SCHOOL PROJECT
- Moringa Innovation Project
- Kapamba Mini Hydro Power Project
- Improving Health Services Uptake in Zambia through Modernization of the Health Sector and Access to Affordable Health Insurance.
- Refuse Bag Manufacturing Project
- ZAMBIA WATER AND SANITATION PROJECT
- Leaux Kitchens Expansion Project
- Open for FDI through a minority stake/Development of a new project/Activities of travel agencies and tour operators; tourist assistance activities n.e.c./Ingwe Expert Safari and Tours
