logo
Project

Lufubu Hydropower Project

Closed · Zambia

Source: United Nations Industrial Development Organization (UNIDO)

The Lufubu hydropower scheme Project is a new project to be developed on the Lufubu River Basin in Mpulungu and Nsama District of Northern Province. It is aimed at strengthening the national grid supply and stability, contributing to economic growth as well as unlocking tourism and investment potential in the northern part of Zambia. The Lufubu River runs through the Northern Province and is one o

Status
Closed
Sector
Hotel, Power Generation (CCGT), Hydro, Rail, Government, Water Supply and Storage, Manufacturing (Industrial)
Location
Kalulushi, Zambia
Updated
22 Jul 2026
Source
United Nations Industrial Development Organization (UNIDO)

ConstructChat

Ask ConstructChat about Lufubu Hydropower Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Lufubu Hydropower Project” is an infrastructure initiative in the Hotel sector, located in Kalulushi, Zambia. Taiyo aggregates data on it from United Nations Industrial Development Organization (UNIDO).

Participants

Sponsoring Agency

Status

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Lufubu hydropower scheme Project is a new project to be developed on the Lufubu River Basin in Mpulungu and Nsama District of Northern Province. It is aimed at strengthening the national grid supply and stability, contributing to economic growth as well as unlocking tourism and investment potential in the northern part of Zambia. The Lufubu River runs through the Northern Province and is one of the inflows into Lake Tanganyika. The proposed Hydropower cascade scheme project will consist of a cascade of three (3) power plants to be constructed along the Lufubu River and these will be; the Lufubu 1 (installed phase 1 capacity of 66MW), Lufubu 2 (43MW) and Lufubu 3 (54MW) giving a total phase 1 installed capacity of 163MW. The power plants will be interconnected by 132kV transmission lines. The project has a 4-year construction period. The project is expected to succeed not only because it is profitable (with EBITDA projected at USD118.4m in year 1 of operations and increasing at a projected 2% per annum) and readily available market, but also the project site offers higher and more consistent rainfall patterns than the southern parts of Zambia, where all the country’s major hydropower stations are concentrated. The project is available for FDI through a minority stake. The Lufubu Power Company Limited seeks to meet the cost of construction, acquisition and installations of the Hydropower generation plant and all other project development costs estimated at US$700 million through project financing arrangement to be sourced in form of equity or a loan facility.

Original sector

Production, transmission and distribution of electricity

Location

Country

Zambia

City

Kalulushi

Source

Source reliability

High

Source

United Nations Industrial Development Organization (UNIDO)

URL

More Details

Record type

Project

Sector

Hotel, Power Generation (CCGT), Hydro, Rail, Government, Water Supply and Storage, Manufacturing (Industrial)

Article published date

2023-05-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project