logo

Luhansk District Heating

Sector: Water Supply and Storage • Location: Ukraine

Source: European Bank for Reconstruction and Development (EBRD)

Project
Cancelled

Translated version of this PSD: Ukrainian The EBRD is considering providing a loan to municipal district heating utility “Luhansk Municipal Communal Enterprise “Teplokomunenergo”” (the “Company”), operating in the City of Luhansk to finance installation of individual sub-stations, network replacement with pre-insulated pipes, modernisation of boilers and control systems, installation of monitoring

Project Information FAQ

Project Information

4 Q
The project “Luhansk District Heating” is an infrastructure initiative in the Water Supply and Storage sector, located in Ukraine. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

cancelled

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Translated version of this PSD: Ukrainian The EBRD is considering providing a loan to municipal district heating utility “Luhansk Municipal Communal Enterprise “Teplokomunenergo”” (the “Company”), operating in the City of Luhansk to finance installation of individual sub-stations, network replacement with pre-insulated pipes, modernisation of boilers and control systems, installation of monitoring and dispatching “SCADA” system. The project aims at significantly improving the energy efficiency, reducing energy losses, gas and electricity consumption and improving the quality of heat and hot water supply services in the City. The Project is part of an Integrated Approach to Reform in the Ukrainian District Heating Sector that sets out specific transition objectives for the sector which, by their nature, would benefit from a multi-project and strategic approach, to create a synergy between priority investments, technical cooperation, and sector policy dialogue. The transition impact of the project is expected to derive from: Framework for markets The Project will support a tariff setting methodology development and adoption at the National Utility Tariff Regulator level with a view to ensuring: (i) the full operating cost recovery and cost control; (ii) full investment cost recovery based on the investment programme assessment to be performed by the National Utility Tariff Regulator and (iii) improved revenue predictability and planning through a process of formalised, regular, transparent and timely adjustment of rates. The City and the Company will enter into a Public Service Contract, which will clearly define the City and the Company’s rights and obligations regarding the district heating services provision and capital improvements including the tariff setting rules and policy. The demand-side measures proposed by the project will help the Company increase its consumption-based billing and further improve revenue collection. Demonstration of successful restructuring Through physical investments and commercialisation resulting from implementation of the Corporate Development Support Programme, the project will improve operational and financial performance of the Company and will have a significant demonstration effect for other cities and utilities in Ukraine concerning ways to improve energy efficiency of district heating operations and reduce losses and costs. Energy Efficiency Through investment programme implementation the project is expected to result in significant energy efficiency gains as well as enable better energy management at the building level, thereby providing incentives for energy-savings by end-users. Luhansk Municipal Communal Enterprise “Teplokomunenergo”, a municipal district heating utility wholly owned by the City of Luhansk. EUR 20 million loan to the Company, secured by a municipal guarantee. The project is expected to be co-financed by a grant of up to EUR 5 million from the Eastern Europe Energy Efficiency and Environment Partnership (E5P). The project will be also complemented with a EUR 4 million loan to the City of Luhansk from the Nordic Environment Finance Corporation (“NEFCO”), also co-financed with EUR 1 million grant from the E5P. Up to EUR 30 million. The project has been categorised B in accordance with EBRD's 2008 Environmental and Social Policy. The priority investments into the rehabilitation and modernisation of the district heating infrastructure are expected to bring environmental and social benefits associated with the overall improvement in the quality of heating and hot water services in the City, improved energy efficiency, reduction in fuel consumption and heat and water losses, and lower air emissions. The due diligence has been finalised and included a corporate review of the Company’s corporate environmental, health and safety and social management capabilities and procedures in relation to its own workforce and construction contractors, and an analysis of the environmental and social impacts and benefits of the proposed priority investment programme to establish the level of project's compliance with EBRD's Performance Requirements (PRs). There were no major issues identified and any adverse impacts are expected to be limited to short-term environmental, health and safety issues arising from construction works which can be adequately mitigated by taking environmental protection measures into consideration in construction planning and work practices. Particular attention needs to be paid to conducting an asbestos survey and developing and enforcing implementation of strict procedures for handling and removal of asbestos-containing materials. An Environmental and Social Action Plan (ESAP), containing mitigation measures for identified issues along with a framework for provision of information to stakeholders have been developed and are currently being reviewed by the Company. The Company will need to implement the ESAP, provide timely information to stakeholders affected by the Project and submit annual environmental and social reports to the Bank. Pre-signing Post-signing

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data