Lululemon - Ann Arbor, MI
Sector: Manufacturing (Industrial) • Location: Ann Arbor, Michigan, United States of America
Source: Dodge USA
Interior renovation and exterior removal of metal grid and columns from storefront to be replaced with new wordmarks. Interior renovation includes minor reconfiguration of walls, new fixtures, and new finishes. Reconfigure electrical and plumbing per new plan. Existing hvac to remain.
- Status
- Closed
- Sector
- Manufacturing (Industrial), Commercial, Metal, Power Generation (CCGT)
- Location
- Ann Arbor, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Lululemon - Ann Arbor, MI
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Interior renovation and exterior removal of metal grid and columns from storefront to be replaced with new wordmarks. Interior renovation includes minor reconfiguration of walls, new fixtures, and new finishes. Reconfigure electrical and plumbing per new plan. Existing hvac to remain. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Ann Arbor |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Metal, Power Generation (CCGT) |
Article published date | 2024-11-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
