logo
ProjectPre-Design

Lumber River Solar

Sector: Forest Products and Packaging • Location: Maxton, North Carolina, United States of America

Source: Dodge USA

74 mW on 1,143 acres

Status
Prospective
Sector
Forest Products and Packaging, Power Generation (CCGT), Solar, Commercial
Location
Maxton, North Carolina, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Lumber River Solar

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Lumber River Solar” is an infrastructure initiative in the Forest Products and Packaging sector, located in Maxton, North Carolina, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

74 mW on 1,143 acres

Procurement method

Budget

Location

Country

United States of America (USA)

State

North Carolina

City

Maxton

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Forest Products and Packaging, Power Generation (CCGT), Solar, Commercial

Article published date

2024-03-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project