Lumby - Flood Mitigation Project
Sector: Road • Location: British Columbia, Canada
Source: Infrastructure Canada
The Village of Lumby has been prone to severe flooding throughout the Village boundaries for decades, as it is situated at the confluence of three creek systems. This project includes developing nearly 1 km of physical flood protection for the community at critical areas where businesses and private properties have been regularly affected in past flooding, as well as floodplain restoration. The sp
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | pre-construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Village of Lumby has been prone to severe flooding throughout the Village boundaries for decades, as it is situated at the confluence of three creek systems. This project includes developing nearly 1 km of physical flood protection for the community at critical areas where businesses and private properties have been regularly affected in past flooding, as well as floodplain restoration. The specific flood protection works (setback dike, flood wall, and retreat/restoration of one property) included in this project were recommended as high-priority for implementation through floodplain mapping (2018) and a Flood Mitigation Plan (2019). The project includes site assessments, updated hydrological analysis and hydraulic analysis, environmental and archaeological works, permitting, detailed design, tendering, and construction of flood protection works. The design level of protection is the 200-year return period hydrological event, with future climate change adaptation. The proposed project has two components. 1) The first component is a 460 m long setback dike on the right bank of Duteau Creek upstream of Shuswap Avenue: The setback dike is an earth embankment that will have a 4 m wide crest. The crest of the dike will be used for operation and maintenance access, but also as a multi-use pathway for the community to use. The dike will tie into Shuswap Avenue and the Village has a future flood mitigation project planned for a bridge replacement and upgrades on Shuswap Avenue. A conceptual alignment of the setback dike is shown in the KWL 2019 Flood Mitigation Plan (attached to this application). 2) The second component is a 477 m long waterside dike on the right bank of Bessette Creek between Quesnel Road and Maple Street: The waterside dike is a narrow dike and will include riprap scour and erosion protection. The dike will be placed between creek channel and properties. Includes managed retreat of 1 property for floodplain restoration |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |