Lumby - Flood Mitigation Project

Sector: Bridge • Location: British Columbia, Canada

Source: Infrastructure Canada

Project
Pre-Construction

The Village of Lumby has been prone to severe flooding throughout the Village boundaries for decades, as it is situated at the confluence of three creek systems. This project includes developing nearly 1 km of physical flood protection for the community at critical areas where businesses and private properties have been regularly affected in past flooding, as well as floodplain restoration. The sp

Project Information FAQ

Project Information

5 Q
The project “Lumby - Flood Mitigation Project” is an infrastructure initiative in the Bridge sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

pre-construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Village of Lumby has been prone to severe flooding throughout the Village boundaries for decades, as it is situated at the confluence of three creek systems. This project includes developing nearly 1 km of physical flood protection for the community at critical areas where businesses and private properties have been regularly affected in past flooding, as well as floodplain restoration. The specific flood protection works (setback dike, flood wall, and retreat/restoration of one property) included in this project were recommended as high-priority for implementation through floodplain mapping (2018) and a Flood Mitigation Plan (2019). The project includes site assessments, updated hydrological analysis and hydraulic analysis, environmental and archaeological works, permitting, detailed design, tendering, and construction of flood protection works. The design level of protection is the 200-year return period hydrological event, with future climate change adaptation. The proposed project has two components. 1) The first component is a 460 m long setback dike on the right bank of Duteau Creek upstream of Shuswap Avenue: • The setback dike is an earth embankment that will have a 4 m wide crest. • The crest of the dike will be used for operation and maintenance access, but also as a multi-use pathway for the community to use. • The dike will tie into Shuswap Avenue and the Village has a future flood mitigation project planned for a bridge replacement and upgrades on Shuswap Avenue. • A conceptual alignment of the setback dike is shown in the KWL 2019 Flood Mitigation Plan (attached to this application). 2) The second component is a 477 m long waterside dike on the right bank of Bessette Creek between Quesnel Road and Maple Street: • The waterside dike is a narrow dike and will include riprap scour and erosion protection. • The dike will be placed between creek channel and properties. • Includes managed retreat of 1 property for floodplain restoration

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data