Lumut Maritime Terminal Sdn Bhd (LMTSB) developed Lumut Port and the adjacent industrial park under a Build/Own/Operate/Transfer concept for a concession period of twenty years. Lumut Port is located mid-way along the Strait of Malacca on the west coast of Peninsula Malaysia in Perak State. RM80 million (US$21 million) was invested in Lumut Maritime Terminal (LMT), which was designed for geared v

Project Information FAQ

Project Information

5 Q
The project “Lumut Port” is an infrastructure initiative in the Car parking sector, located in Malaysia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Lumut Maritime Terminal Sdn Bhd (LMTSB) developed Lumut Port and the adjacent industrial park under a Build/Own/Operate/Transfer concept for a concession period of twenty years. Lumut Port is located mid-way along the Strait of Malacca on the west coast of Peninsula Malaysia in Perak State. RM80 million (US$21 million) was invested in Lumut Maritime Terminal (LMT), which was designed for geared vessels and could accommodate ships up to 45,000 dwt. LMTSB was a joint venture between Perbadanan Kemajuan Negeri Perak (PKNP)(30%), Halim Rasip Holdings Sdn Bhd (HRH)(30%) and Ipco International Ltd.(40%). IPCO was the EPC contractor for the construction of the Lumut Port. As of 2002, the venture was 80% owned by Integrax and 20% by Malakoff Bhd. By the late 1990s, the port was attracting power producer Tenaga Nasional Bhd. (TNB) to locate a 2,100 MW power station at the port that resulted in the building of the much larger Lekir Bulk Terminal (LBT). Part of the deal with Tenaga was the development of LBT for use by the power station. Some RM400 million was spent on developing LBT which was the largest bulk port in South east Asia. Under the first phase of development a 830 m berth was built with a capacity to handle up to a 200,000 dwt Capesize vessel. There were two ship unloaders on the berth giving an annual capacity of 12m tonnes of dry bulk a year. The terminal had 20 m natural deepwater meaning that no dredging was required. LBT began operations in May 2002 and managed to handle close to 1.4 million fwt of cargo in the first six months of 2003. As of 2003, Lumut Port had a combined capacity of 12.2 million metric tonnes per annum, with LMT having 3.2 million metric tonnes and LBT, 9 million metric tonnes.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data