logo

Lundabron Bridge / Strasky, Husty a partneri (SHP)

Sector: Cement

Source: ArchDaily

Project
Closed

At the abutments the deck is supported by multi-directional bearings; the longitudinal guidance of expansion movements is ensured by guide bearings located in the bridge axis. To reduce the deck’s longitudinal movement due to the live load and dynamic component of the wind load, the deck is connected with the abutments by 2x2 shock-transition units. These units, together with the fixed connection

Project Information FAQ

Project Information

3 Q
The project “Lundabron Bridge / Strasky, Husty a partneri (SHP)” is an infrastructure initiative in the Cement sector. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

At the abutments the deck is supported by multi-directional bearings; the longitudinal guidance of expansion movements is ensured by guide bearings located in the bridge axis. To reduce the deck’s longitudinal movement due to the live load and dynamic component of the wind load, the deck is connected with the abutments by 2x2 shock-transition units. These units, together with the fixed connection of the suspension cables with the deck at the mid-span guarantee the bridge’s aerodynamic stability.A simple railing, which is formed by a handrail supported by inclined posts, has rope filling. The walkway is lit by LED lights situated in the handrails.Text description provided by the architects.The footbridge, which is situated in the city’s recreation area, connects the river’s left bank with the island of Bölesholmarna and links up to a small bridge bridging the arm of the river. The footbridge connects pedestrian and cyclist trails situated along both river's banks; it also carries electrical and communication cables.Utilizing the suspension structural system allowed the designing of a slender and transparent structure whose scale corresponds to the setting and whose shape matches the beautiful countryside where there is no straight line. The structure is light and transparent; it consists of elements that have a human scale. The structure does not overcome the beautiful surroundings, but it complements them. The bridge is comfortable for the users, and its movement caused by walking people or wind does not cause unpleasant feelings to users.The footbridge consists of a prestressed concrete deck of one span of the length of 179.00 m, which is suspended on two inclined suspension cables of three spans of lengths of 28.80+187.00+29.50 m. The bridge deck has a variable width - from 6.40 m in the middle of the bridge to 8.40 m at the abutments. The maximum sag of the cables is 20.90 m. The bridge deck is assembled of 59 three-meter-long prefabricated concrete segments and two monolithic end cross members.The streamlined cross-section of the bridge deck consists of only 400 mm deep edge beams and a 140 mm thick bridge deck slab. Each segment is reinforced by floor beams at the joints. Two suspension cables consist of 2x55 mono-strands grouted in steel pipes of 273 mm diameter. The deck is fix connected with suspension cables in the middle of the bridge.The 30.25 m tall pylons have the shape of the letter A. The pylons’ legs, which are inclined longitudinally and transversely, are assembled from precast, match-cast concrete segments. At the pylons’ tops, anchor boxes of the cables were connected to the legs. The tensile force from the cables is transmitted to the end steel anchor blocks anchored in the footing slabs.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data