Lundby School / D Office arkitekter
Sector: Commercial • Location: Sweden
Source: ArchDaily
Text description provided by the architects.We have had the honor and trust of designing the new Lundby School on Hisingen for the City ofGothenburg. The school was completed and ready for occupancy in 2024 and is designed for 630 students in grades 7-9, as well as students with intellectual disabilities in compulsory school.The activities on the ground floor thus help illuminate the space to prom
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Text description provided by the architects.We have had the honor and trust of designing the new Lundby School on Hisingen for the City ofGothenburg. The school was completed and ready for occupancy in 2024 and is designed for 630 students in grades 7-9, as well as students with intellectual disabilities in compulsory school.The activities on the ground floor thus help illuminate the space to promote safe outdoor environments around the building. The interior design is characterized by natural materials such as slate and wood, combined with a subdued color scheme in dark hues, to contribute to a calm and harmonious environment where students can feel at home. The sports hall consists of an event hall with retractable bleachers for 1,000 spectators and a ceiling height of 10 meters. The hall can be divided into two full-sized halls with a curtain wall, allowing the spaces to be used in the best possible way by both the school and the community organizations.The building also houses a cultural school and a sports hall with associated facilities for the sports and association administration. An important starting point for the design of the school has been to create a safe and welcoming place and an environment to thrive in, both during and after school hours.For the exterior design of the building, it was of great importance to connect to the location and the old school (through the use of red brick and traditional material choices.), which has been partially preserved. At the same time, the building's facade was designed to reflect the modern school that it is, a building that meets the demands of contemporary society. The school's facade is characterized by large glass sections that showcase the activities of the surrounding area. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
