Lung Vai School / 1+1>2 Architects
The status, timeline and source of this project. A free account opens every field.
Source: ArchDaily
The school comprises three classrooms, two for kindergarten and one for elementary school. Corridors, classrooms, and toilets sit under a large, curved iron roof that resembles a flying saucer perched on the hillside or a forest mushroom springing up from the ground. Viewed from above, the construction brings to mind a terraced field with sparkling water mirroring the mountains and forest scenery.
- Status
- Closed
- Sector
- Road, Power Generation (CCGT), Metal, Water Supply and Storage, Residential, Steel, Commercial, Government, Education, Warehouse
- Updated
- 22 Jul 2026
- Source
- ArchDaily
ConstructChat
Ask ConstructChat about Lung Vai School / 1+1 2 Architects
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The school comprises three classrooms, two for kindergarten and one for elementary school. Corridors, classrooms, and toilets sit under a large, curved iron roof that resembles a flying saucer perched on the hillside or a forest mushroom springing up from the ground. Viewed from above, the construction brings to mind a terraced field with sparkling water mirroring the mountains and forest scenery.Mushroom springs from the ground -Lung Vai village is located atop a craggy mountain where the Hmong people reside. The lack of a road network makes accessibility extremely difficult. During the construction process, people from Lung Vai and the neighboring village of Bac Sum joined hands to pave the way, enabling construction materials to be transported more easily.The curved mud walls embrace the terrain making the classrooms seem to burst from and absorb nature, eliminating the boundary between inside and outside. Thanks to the thick mud wall system, large windows, and skylights in the roof, ventilation is assured. Sufficient lighting and air circulation make the school appear like a natural entity.Without electricity and water being scarce, the construction work was carefully managed to maximize local materials and labor use. The design of Lung Vai school adopted the traditional rammed earth wall technique that help the school to blend in with the village. |
Location
| Not available for this record. |
Source
Source | ArchDaily |
URL |
More Details
Record type | Project |
Sector | Road, Power Generation (CCGT), Metal, Water Supply and Storage, Residential, Steel, Commercial, Government, Education, Warehouse |
Article published date | 2025-06-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
