Lupinus 2 Solar+Storage Project
The owner, status and timeline of this project. A free account opens every field.
Source: IndexBox
Lupinus 2 project in Franklin County, Texas, with 241 MWac of solar power and 121.5 MWac battery storage. Construction began in late 2025, with commercial operations expected in late 2027.
- Status
- Under Construction
- Sector
- Energy Storage, Power Generation (CCGT), Solar, Commercial
- Location
- Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- IndexBox
ConstructChat
Ask ConstructChat about Lupinus 2 Solar+Storage Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Lupinus 2 project in Franklin County, Texas, with 241 MWac of solar power and 121.5 MWac battery storage. Construction began in late 2025, with commercial operations expected in late 2027. |
Original sector | Energy |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
Source
Source | IndexBox |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Power Generation (CCGT), Solar, Commercial |
Article published date | 2026-05-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
