logo

Lusaka Transmission and Distribution Rehabilitation Project

Sector: Power Transmission • Location: Zambia

Source: World Bank Group

Project
Closed

The objective of the Electricity Transmission and Distribution System Rehabilitation Project for Zambia is to increase the capacity and improve the reliability of the electricity transmission and distribution system in the Lusaka area. The project will reinforce and upgrade the power transmission and distribution infrastructure in Lusaka area as a priority to increase the capacity and improve the

Project Information FAQ

Project Information

5 Q
The project “Lusaka Transmission and Distribution Rehabilitation Project” is an infrastructure initiative in the Power Transmission sector, located in Zambia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objective of the Electricity Transmission and Distribution System Rehabilitation Project for Zambia is to increase the capacity and improve the reliability of the electricity transmission and distribution system in the Lusaka area. The project will reinforce and upgrade the power transmission and distribution infrastructure in Lusaka area as a priority to increase the capacity and improve the reliability of the electricity network for consumers throughout the area. This will improve the quality of electricity supply to existing consumers and facilitate the connection of new customers. The project consists of the following three components: (i) rehabilitation of the 132kV and 88kV transmission network in Lusaka Area; (ii) rehabilitation of the 33kV and 11kV distribution network in Lusaka Area; and (iii) technical assistance and project supervision.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data